Page 4 - 2024 Action Handling
P. 4
STEEL FABRICATION
With 50 years of working closely with • Fabrication work in mild steel,
our clients to provide solutions to their aluminium and stainless steel.
requirements, we have both the • MIG, TIG and ARC welding.
knowledge and the facilities to fabricate • CNC facility for machining,
turning and milling.
a wide range of products to exact • In-house spray booth for epoxy
specification: from fine engineered powder coating or specialist finishing.
items through to heavy steel structural • On-site visits to discuss your product
work and steel constructions. designs and technical details.
SITE WORK PROJECT MANAGEMENT
Our on site capacity is most extensive. A Project team are responsible for any work carried
We offer the following services:
out on a customer’s premises.
• Loading docks fabricated and installed.
• Pipework and ducting installations. Typically our Project Team will organise the fulfilment
• Structural alterations and steelwork erecting. of contracts for steel structural work, on site welding,
• Erection of mezzanine floors.
• Office and factory refurbishments. installations including mezzanine floors and office
partitioning, refurbishments and storage/handling
systems that include racking, shelving, conveyors and
automated equipment.
• Integrated offices • A Project Manager will be appointed
to work with customers, to ensure
• Mechanical and electrical installations.
• Internal and external stairways. complete satisfaction.
• Our team can also arrange and monitor permanent
or temporary on site maintenance contracts that can
• Internal staircase
include full mechanical and electrical facilities.
• A project can include the co-ordination of a multitude
of varying requirements so that
customers can enjoy the benefits of a
‘One Stop Shop’ approach to a large contract.
We are happy to work in tandem with other
contractors or manage the contracts on our
customer’s behalf.
• Loading dock installation for the Royal Mail • Steel structural work incorporating a mezzanine floor
2